It has history of series of delays since its inception. The irrigation component of this dam in Medak district is not yet implemented. On October 1999, 1 of 17 radial spillway gates failed on the Singur Dam in Andhra Pradesh, India. This failure occurred during initial filling of the reservoir when the water level was 9.8 feet (3 meters) below design level. The gate became dislodged due to a detachment of the left side trunnion girder. The right side arm supported the gate for 22 hours before becoming completely dislodged and washing away. The Andhra Pradesh State authorities attributed the failure of the gate to inadequate welding between the trunnion girder and the tie flats (Mande et al., 2000). There is no mention of downstream damage resulting from this failure. [6]