Port Mann Bridge...
In order to recover construction and operating costs, the bridge is electronically tolled. The toll rates increased to $1.60 for motorcycle, $3.15 for cars, $6.30 for small trucks and $9.45 for large trucks on August 15, 2015.[35] Through increased p...
Surrey, British Columbia, Canada